Part 2 : Essential Case Studies for Project Managers: Strategies and Solutions

CASE STUDIES

12/7/20243 min read

Scenario 6: Autonomous Vehicle Fails in Night Testing

Challenge

During a critical night test, the vehicle’s camera system failed to detect objects in low-light conditions, jeopardizing safety and stakeholder confidence.

Solution and Metrics

  1. Enhancing Camera Hardware: Upgrade the sensors to high-dynamic-range (HDR) models.

    • Metric for Measurement: Compare detection rates before and after hardware upgrades in low-light conditions.

    • How to Evaluate: Conduct controlled tests across varying light levels and compare results against benchmark datasets.

    • Evaluation Frequency: Weekly until all benchmarks are passed, then quarterly for system health checks.

  2. Improving AI Model: Retrain object detection models using a balanced dataset that includes low-light scenarios.

    • Metric for Measurement: Measure accuracy, precision, and recall in identifying objects during night conditions.

    • How to Evaluate: Use validation datasets to calculate F1 scores and monitor improvements in object classification rates.

    • Evaluation Frequency: Evaluate after each training iteration during development and monthly post-deployment.

  3. Simulation Testing: Use high-fidelity simulations replicating real-world night scenarios.

    • Metric for Measurement: Success rate of simulated drives under varied night conditions.

    • How to Evaluate: Log errors in object detection and measure incident rates.

    • Evaluation Frequency: Daily during debugging, reducing to quarterly during maintenance.

  4. Stakeholder Confidence: Provide transparency through progress reports.

    • Metric for Measurement: Stakeholder satisfaction via surveys and milestone acceptance rates.

    • How to Evaluate: Track qualitative feedback on reports and demos.

    • Evaluation Frequency: After each stakeholder presentation.

  5. System Resilience: Conduct stress tests in adverse weather combined with night conditions.

    • Metric for Measurement: Mean time between failures (MTBF).

    • How to Evaluate: Track failures and incidents in all adverse conditions during test drives.

    • Evaluation Frequency: Quarterly once the system stabilizes.

Scenario 7: Stakeholder Scope Creep in Midway Development

Challenge

A key stakeholder demanded the addition of pedestrian recognition features mid-project, risking delays and overburdening the team.

Solution and Metrics

  1. Revised Project Roadmap: Develop a phased delivery plan.

    • Metric for Measurement: Timeliness of deliverables against the revised roadmap.

    • How to Evaluate: Compare actual vs. planned delivery dates for core and additional features.

    • Evaluation Frequency: Weekly in active phases; bi-weekly for progress tracking.

  2. Budget Control: Quantify cost increases due to feature addition.

    • Metric for Measurement: Budget variance before and after the scope adjustment.

    • How to Evaluate: Review financial records for expenditures tied to new feature development.

    • Evaluation Frequency: Monthly financial audits.

  3. Development Efficiency: Optimize resource use with external consultants.

    • Metric for Measurement: Cost-to-output ratio for external consultants.

    • How to Evaluate: Monitor milestones completed by external teams and their cost contribution.

    • Evaluation Frequency: Monthly or upon completion of consultant contracts.

  4. Stakeholder Satisfaction: Gauge stakeholder reactions to the phased approach.

    • Metric for Measurement: Survey scores and anecdotal feedback during project reviews.

    • How to Evaluate: Record qualitative and quantitative responses post-review meetings.

    • Evaluation Frequency: Post every major milestone delivery.

  5. Team Morale: Monitor the well-being of overburdened team members.

    • Metric for Measurement: Employee satisfaction scores through anonymous surveys.

    • How to Evaluate: Analyze survey trends and note burnout symptoms (missed deadlines, increased errors).

    • Evaluation Frequency: Monthly during intense phases; quarterly otherwise.

Scenario 8: Regulatory Changes During Testing Phase

Challenge

Government regulations introduced stricter collision-avoidance standards during the testing phase, requiring rapid system updates.

Solution and Metrics

  1. Task Force Creation: Form a dedicated compliance team.

    • Metric for Measurement: Time taken to form and operationalize the team.

    • How to Evaluate: Compare formation timelines against project urgency metrics.

    • Evaluation Frequency: Immediate post-regulation announcement; retrospective analysis during project reviews.

  2. Compliance Testing: Align system performance with updated standards.

    • Metric for Measurement: Number of test cases meeting regulatory thresholds.

    • How to Evaluate: Use compliance checklists provided by regulatory bodies.

    • Evaluation Frequency: Weekly until certified.

  3. System Adaptability: Ensure the collision-avoidance system can handle complex scenarios.

    • Metric for Measurement: Increase in successful scenario completions post-update.

    • How to Evaluate: Benchmark pre- and post-update performance using test drives.

    • Evaluation Frequency: Bi-weekly during development; semi-annually post-certification.

  4. Cost Management: Quantify the financial impact of compliance.

    • Metric for Measurement: Percentage of budget used for regulatory updates vs. overall project budget.

    • How to Evaluate: Perform financial variance analysis specific to compliance-related tasks.

    • Evaluation Frequency: Bi-monthly until completion.

  5. Stakeholder Communication: Maintain transparency on progress and delays.

    • Metric for Measurement: Reduction in stakeholder queries about compliance.

    • How to Evaluate: Track number and nature of stakeholder inquiries.

    • Evaluation Frequency: Weekly updates until all compliance milestones are met.

Scenario 9: Budget Cuts Mid-Project

Challenge

A major investor withdrew funding, reducing the budget by 30% and threatening resource allocation.

Solution and Metrics

  1. Reprioritization of Deliverables: Focus on critical features.

    • Metric for Measurement: Completion rate of prioritized deliverables.

    • How to Evaluate: Compare timelines and milestones for critical vs. non-critical tasks.

    • Evaluation Frequency: Weekly until stability is achieved.

  2. Alternative Funding: Seek new investors or partnerships.

    • Metric for Measurement: Amount of funding secured within a specific timeframe.

    • How to Evaluate: Track success rates of funding pitches.

    • Evaluation Frequency: Monthly until funding gap is closed.

  3. Resource Efficiency: Maximize output with existing resources.

    • Metric for Measurement: Productivity per resource (e.g., tasks completed per team member).

    • How to Evaluate: Analyze time-tracking and task management tools for efficiency trends.

    • Evaluation Frequency: Weekly during active phases.

  4. Stakeholder Reassurance: Present revised plans to stakeholders.

    • Metric for Measurement: Stakeholder approval rate for revised plans.

    • How to Evaluate: Record feedback and document approvals.

    • Evaluation Frequency: Bi-weekly until stabilization.

  5. Team Health: Address morale and workload concerns.

    • Metric for Measurement: Employee retention rates and absenteeism.

    • How to Evaluate: Track HR data for signs of burnout or dissatisfaction.

    • Evaluation Frequency: Monthly during recovery.